PARKING STRUCTURES — GREATER MONTREAL

Parking garage waterproofing membranes

Traffic-bearing systems that keep water and road salt out of your structural slab — installed by an RBQ-licensed contractor across Greater Montreal.

Finished underground parking deck coated with a grey traffic membrane and fresh white bay lines
LICENSEDRBQ 5817-2180-01
GOOGLE★★★★★ 59 verified reviews
COVERAGEGreater Montreal
FIRST STEPFree on-site assessment
01 — THE PROBLEM

Water is what destroys a parking structure

AMeltwater and de-icing salt arrive on every vehicle
BChloride solution soaks through bare concrete
CReinforcing steel corrodes and expands
DThe slab cracks from the inside out

A parking slab is not just a floor — it is the structure. Every winter, vehicles carry in meltwater loaded with de-icing salt. Bare or failed concrete lets that chloride solution soak through to the reinforcing steel, and once the rebar begins to corrode it expands, cracking the slab from the inside out.

By the time you see spalling on a ceiling below, staining on a column, or efflorescence hanging from a deck soffit, the damage is structural and the repair is an order of magnitude more expensive than the membrane would have been.

A traffic-bearing membrane breaks that cycle. It is a continuous, flexible, waterproof layer bonded to the deck, built to carry vehicle loads and to bridge the small movements and hairline cracks that concrete develops as it ages.

It also does the everyday work you notice: it stops the dusting, gives you a surface that can be washed, resists oil and fuel drips, and takes line marking cleanly.

What a membrane gives you

BEYOND WATERPROOFING
/01

Slip resistance

Aggregate broadcast into the intermediate coat gives tires and pedestrians grip, wet or dry.

/02

Washable surface

No more concrete dusting. Salt residue and grime wash off instead of soaking in.

/03

Wear and abrasion resistance

A renewable wear coat takes daily traffic, turning and braking loads.

/04

Oil and fuel resistance

Drips from vehicles stay on the surface where they can be cleaned up.

/05

Clean line marking

Bay lines, numbers and arrows apply crisply and stay legible. A brighter, better-kept garage.

/06

Longer structure life

Keeping chlorides away from the rebar is what protects the slab itself.

02 — SYSTEMS WE INSTALL

No single right product

There is no single right product for a parking structure. The system is chosen around the deck’s exposure, its condition, how much movement it has and how long you can give us for access.

01 / 04 — MOST SPECIFIED

Polyurethane traffic membrane

This coating system utilizes epoxy and polyurethane technologies to protect parking decks and concrete traffic bridges. It is an elastomeric, waterproofing, seamless system designed to protect concrete substrates against water infiltration and wear caused by vehicular traffic. The membranes included in this system provide high elongation and tear resistance.

Underground parking level finished with a grey polyurethane traffic membrane and yellow directional markings
Traffic membrane layer build-up: concrete substrate, primer, membrane, wear coat and optional topcoat
EF-160Moisture vapor barrier primer for dry or damp concrete surfaces.
AQUAFLOW-400Water-base epoxy deep penetrating concrete primer.
03 — WHERE WE WORK

Structures we work on

We work directly with property managers and condominium syndicates, and alongside general contractors, engineers and architects where the work is specified. If you have a condition assessment or an engineer’s report, send it with your enquiry and we will quote to the specification.

PROPERTY MANAGERSCONDO SYNDICATESGENERAL CONTRACTORSENGINEERSARCHITECTS
Underground parking
Multi-storey decks
Ramps and drive lanes
Exterior parking decks
Condo and residential buildings
Commercial and institutional
Loading areas
Mechanical and storage rooms
04 — PROCESS

How the work is done

STEP 01 OF 05
01

Assessment of the existing deck

We walk the structure, check the condition of the concrete, look for delamination, test for moisture, and identify where water is actually getting in. You get a written scope, not a guess.

›Deck sounded for hidden delamination
›Moisture and vapour readings taken
›Drainage and ponding reviewed
›Written scope and fixed price issued
Concrete moisture reading taken with a Tramex meter during a parking deck assessment

We work around the building, not the other way round

Almost no building can close its parking. Work is staged by zone or by level so residents and tenants always have somewhere to park, with schedules agreed in advance and posted. Where the window is tight, a polyaspartic build returns a zone to service quickly. Evening and weekend work is available where daytime access is impossible.

Zone by zoneParking stays open throughout
Written scopeFixed price before work starts
RBQ 5817-2180-01Licensed and insured
05 — RECENT WORK

See finished floors

Parking decks, warehouses, plants and workshops completed across Greater Montreal.

06 — FAQ

Questions we get asked

How long does a parking membrane last?+

A correctly installed and maintained traffic membrane is a long-term system, and the wear coat is designed to be renewed periodically rather than the whole build-up being replaced. Life depends far more on drainage, traffic volume and how well the detailing was done than on the product on the label. Warranty terms on commercial work are set per project and stated in the quote.

Can you work on an occupied building?+

Yes — that is the normal case. We stage the work so part of the structure is always available, agree the schedule with the property manager before starting, and post notices for residents. Odour is a real consideration underground, and we plan ventilation and product selection around it.

Do you work from an engineer’s specification?+

Often, yes. If your building has had a condition assessment or you are working to a consultant’s spec, send it with your enquiry and we will price the specified system. Where there is no spec, we will tell you what we would install and why.

What if the concrete is in worse shape than it looks?+

That is what the assessment is for. Delamination is not always visible, and finding it after mobilisation is how projects go over budget. We sound the deck and set out repair quantities before quoting, so the number you get reflects the structure you actually have.

07 — START HERE

Request a site assessment

Tell us about the structure and we will arrange a walkthrough. Assessments are free, and you will get a written scope and a fixed price before any work is scheduled.

PREFER TO TALK IT THROUGH? (438) 508-5984 Mon–Fri 9:00–17:00 · info@olipoxy.com
Olipoxy © Olipoxy · RBQ 5817-2180-01 · Greater Montreal

Contactez-nous maintenant

Nous aimerions en savoir plus sur votre projet. Contactez-nous aujourd'hui pour commencer.

Appelez ou textez dès aujourd'hui!

Reach Out Now

We'd love to hear about your project. Contact us today to get started.

Call or text today!